The Alimak raising method consists of five steps, which together make up a cycle. The five steps are all dependent on the Raise Climber, which. ALIMAK INC. – Alimak Raise Climber. Operating height (m): . Operating width (m): Platform dimensions: m x m. Maximum length. In underground mining, a raise refers to a vertical or inclined excavation that leads from one level, or drift, to another. A raise may also extend to surface. There are four excavation methods for raises: Conventional or open raise; Long- hole or drop raise; Alimak ยท Raise boring.

Author: Tole Kazikinos
Country: Costa Rica
Language: English (Spanish)
Genre: Photos
Published (Last): 2 March 2015
Pages: 72
PDF File Size: 8.56 Mb
ePub File Size: 11.96 Mb
ISBN: 310-6-48335-229-2
Downloads: 85662
Price: Free* [*Free Regsitration Required]
Uploader: Vozahn

Writing tools A collection of writing tools that cover the many facets of English and French grammar, style and usage. These drifts are also driven from the shaft or existing development but, unless rraise is another lift, they often need only be large enough for the movement of supplies.

The graph abscissa see above figure is the hydraulic radius of alimk stope. Drill holes extend to just less than half way to the next raise and are oriented slightly down from horizontal. The broken ore often compacts slightly, resulting an effective swell of about one third its unbroken volume. Faster Access to Undeveloped Ore Once the climber nests are established, ore starts to flow.

Since its introduction, the Raise Climber has been developed and improved into what is now the 6th generation, the Alimak RCM-series, enabling fast, mechanized drilling of long, inclined shafts and improved working environment. A narrow vein ore body has less ore to soak up waste development costs, making the raise mining method an obvious choice.

Pressure shafts totalling m. Two parallel pressure shafts of metres. Inclined pressure shafts totalling Manroc routinely applies rigorous maintenance programs and checks on all our Alimak equipment ensuring the safety of all individuals.

The platform can be any shape and size. The machine, equipped with rack-and-pinion drive, travels along a guide rail and monorail with pinion rack, which are bolted to the hangingwall by expansion bolts. Inclined pressure shafts totalling m.

  2002 CAMRY OWNERS MANUAL PDF

The method works best if the ore boundaries can be interpolated between adjacent raises. Raise Mining Raise mining is a “longhole” method of bulk mining tabular narrow vein ore bodies.

Fewer, larger stopes can be taken quicker because there are fewer cycles, i. We are your preferred underground mining professionals. Alimak machines are in operation throughout the world, developing ore passes, ventilation shafts, main shafts, and others, at various inclinations and lengths.

ALIMAK Raise Climber

The nest will be slashed out of the drawpoint backs if development is from the hangingwall side. The blasts are timed to slash down, with the footwall holes often the last to fire. Drilling, which is done from the platform of the Raise Climber. How Raide Works The Alimak method raises between levels in a safe and effective manner. A collection of writing tools that cover the many facets of English and French grammar, style and usage.

The five steps of a cycle are Drilling, which is done from the platform of the Raise Climber. Mining Equipment and Tools [1]. In theory, and if properly cabled, the foliated hangingwall could be approximated as a laminate beam by the Voussoir approach, as described by Hutchinson and Diederichs This advantage is easily visualized if one imagines the hangingwall as a fractured beam or plate. It is better if the rwise body is continuous over several hundred feet vertically.

China climber 1 China steel climber China climber stepper. Penstocks of around cllimber. Furthermore, the Alimak Raise Climber implements a rack and pinion rail, designed to carry air and water for increased ventilation.

Alimak raise climber (4) | Rubicon Minerals | Flickr

Change the order of display of the official languages of Canada English first French first Option to display the non-official languages Spanish or Portuguese Neither Spanish Portuguese Display cimber, contexts, etc.

Alimak Raise Climbers and shaft enlarging equipment are available for underground mining, civil engineering and hydro-electric power generation as vlimber as for operating as inter-level service lifts. This step will be included if the stope is in an area that requires fill and the fill method requires a fence. The holes are most often mechanically loaded with either ANFO or an emulsion explosive. The Raise Climber serves both as working platform and as a means of transport up to the work face.

  EW GRAZE POWERCORE PDF

Better Ground Control Cables can be installed right up the middle of the hangingwall, where they will do the most good. When the air has been cleared the crew can ascend in the Raise Climber to the face, scale and install a new guide rail section, all under protection of the safety roof.

This is very cost effective as the raise is centred in the stope, which concentrates the support where it is needed most. With better ground control, larger stopes can be taken.

Less Cost With less alimk, faster ore access, climer ground control, and faster overall mining, it is easy to see how raise mining will cost less than regular open stoping. In which subject field? The raise mining method takes advantage of this concept because, even though the hangingwall is only supported up its centre, the resulting two unsupported strips are long and narrow and are more riase to be self-supporting.

This step is done once the stope is completely blasted. The main ore access is gained almak driving a raise up dip along the centre of the stope hangingwall, rather than from over and under-cuts driven along strike, as is done with regular open stoping. This should also contribute to a more stable hangingwall. The sub-horizontal production drill hole direction allows the use of the undercut as a slot and because of the increased stope height, there will be significantly fewer of these than there would be alumak required for regular open stoping in the same area.